Springwater Corridor

BikeGreenwaySpringwater CorridorOregon

By the Love Hiking Trails teamUpdated November 12, 2026

A 21-mile paved former rail line from Portland's Willamette riverfront out past Gresham to Boring.

No ratings yet – be the first

The trail is closed between Boring Station Park (SE Dee St) and SE Haley Rd for construction on weekdays, 7 a.m. to 5 p.m., through November 2026. A shuttle with a bike rack carries trail users around the 3/4-mile detour during work hours. until Nov 30, 2026

checked 2026-11-12 · Closure source

At a glance

Distance

21 mi, SE Ivon St in Portland to Boring (Portland Parks & Recreation, Clackamas County)

Elevation gain

Not published

Trail style

Paved rail-trail from Portland's riverfront to Boring

Surface

Paved, about 10 to 12 ft wide, with gravel shoulders on parts

Permit

None listed

Fees

None listed

Season

Year-round

E-bike policy

Not stated

Overview

The Springwater Corridor follows the old Springwater Line, a 1903 rail line that once linked Portland with Gresham, Boring and Estacada. Today it is a 21-mile paved trail from SE Ivon Street in Portland to Boring, passing wetlands, buttes, farm fields, neighborhoods and industrial areas, mostly separated from roads.

  • Willamette riverfront section in Portland
  • Johnson Creek, wetlands and buttes
  • Main City Park in Gresham

Passenger service on the Springwater Line ended in 1958. The Portland segment was finished in 1996, the Gresham section the same year, a mile east of Gresham in 2000, and the 3-mile Springwater on the Willamette segment in 2005. Clackamas County widened and paved 2.25 miles near Boring in 2013.

Plan your visit

Getting there

Start at Main City Park in Gresham and ride west toward Portland, or east toward Boring outside weekday work hours.

Good to know

Most of the trail is separated from roads, but it does cross streets. Expect walkers, runners and cyclists, and wildlife along the corridor.

Trailhead map

Leaflet Tiles © Esri

Trailhead at 45.4961, -122.4313. Approximate location; check the official map.

Where to stay near Springwater Corridor

Nearest town: Gresham, OR

Find hotels and rentals near Springwater Corridor

We may earn a commission if you book a stay through these links, at no extra cost to you. Prices and availability come from booking partners and can change. We never rank trails by commission.

Gresham to Portland

  1. 1Start at Main City Park in Gresham.
  2. 2Ride west along Johnson Creek through outer Southeast Portland.
  3. 3Pass the Johnson Creek Boulevard trailhead at SE 45th Ave.
  4. 4Continue to the Willamette riverfront and SE Ivon St, or turn back.

Tips

  • Check the Portland Parks page for the Boring construction closure.
  • Ride west from Gresham to avoid the work zone.
  • Look for wildlife in the wetlands along Johnson Creek.
  • Combine the ride with Portland's riverfront paths.

What to bring & gear

  • Helmet
  • Water bottle or two
  • Bike lock for town and food stops
  • Spare tube, tire levers and a mini pump
  • Phone with an offline map
  • Sun protection
  • Front and rear lights if you may ride near dusk

Photos

Places to eat nearby

  • Wall Street Pizza

    Pizza0.2 mi away Directions

  • Stomping Grounds Coffee House

    Coffee shop0.3 mi away Directions

  • Nicholas Restaurant

    Lebanese restaurant0.3 mi away Directions

  • The Hoppy Brewer

    Pub0.3 mi away Directions

Ratings & Comments

—

No ratings yet

5 star0
4 star0
3 star0
2 star0
1 star0

Sign in to rate this trail and leave a comment.

No comments yet. Share what the trail was like for you.

Nearby

More trails

Frequently asked questions

How long is the Springwater Corridor?

21 miles, from SE Ivon Street in Portland to Boring.

Is it paved?

Yes, about 10 to 12 feet wide, mostly separated from roads.

Is any of it closed?

On weekdays through November 2026, the section between Boring Station Park and SE Haley Rd is closed 7 a.m. to 5 p.m., with a shuttle around it.

What was it before?

The Springwater Line, a rail line developed in 1903 that carried passengers until 1958.